Contact us now
On behalf of the NHS, Mercer Scaffolding successfully erected access scaffolding for window replacement project at Guys Hospital. The Mercer team had to work within a very congested area of London with limited access routes. Equipment delivery and usage was planned flawlessly in order to limit disruption in the area.
The team utilised its flexible lorry fleet to ensure the best vehicle was sent to and from the site. Given the limited access and regular congestion around the hospital, team leader Mr Nathan Mercer favoured 7.5tonne IVECO trucks in these more difficult to reach areas.
The team utilised its flexible lorry fleet to ensure the best vehicle was sent to and from the site. Given the limited access and regular congestion around the hospital, team leader Mr Nathan Mercer favoured 7.5tonne IVECO trucks in these more difficult to reach areas.